Skip to content
Vinod Jose

8 min· water· building

The deadline Ridgewood is racing

EPA's proposed PFAS rollback did not slow Ridgewood Water down. Its deadline is a New Jersey consent order for the end of 2026, and its records show what that bought.

Ridgewood Water's latest public notice, dated October 16, says PFOA is over New Jersey's limit at 17 of its points of entry, and that eight of its twelve new treatment plants are online. The last one is due in early 2027. EPA's proposal to give utilities until 2031 for PFOA and PFOS has not changed that schedule at all, because Ridgewood's deadline is a state consent order.

The weekly brief that started this piece said EPA's rollback has turned PFAS into a "fragmented, state-by-state compliance environment". That is true, and too abstract to act on. I wanted to see what it looks like inside one utility's records. Ridgewood Water serves about 61,000 people in Ridgewood, Glen Rock, Midland Park and Wyckoff, in Bergen County, from 52 wells. It has been building PFAS treatment since 2018, and it posts its notices, budgets and plans.

I believe the question to ask about any utility is which deadline it is working to. For Ridgewood it is a state date that arrives more than two years before the federal one. For a utility across the state line in Pennsylvania, it is the federal date alone.

1. What EPA proposed, and what it did not

The federal rule of April 2024 set limits of 4.0 parts per trillion (ppt) for PFOA and PFOS, 10 ppt for three other PFAS, and a hazard index for mixtures, with compliance by April 26, 2029. In May 2025 EPA said it would keep the PFOA and PFOS limits and rescind the rest.

The two proposals came out on May 20, 2026. The first would rescind the limits for PFHxS, PFNA, GenX and the mixture. EPA's stated reason is procedure: the proposal says it is "necessary to correct the unlawful procedure under which these regulations were promulgated." EPA's own page adds that when it evaluates these PFAS again, "it is possible that the result could be more stringent requirements."

The second is the one behind the 2031 headlines. It proposes a federal exemption that moves the compliance date "from April 26, 2029, to April 26, 2031, for those systems that submit a request." EPA's version applies "in states, territories, and Tribes that have not obtained primacy for those MCLs". In a state with primacy, the state decides. Comments on both closed on July 20, 2026. EPA said it aimed to finalize the extension in the fall; I have not found a final rule as of November 3.

So PFOA and PFOS stay at 4.0 ppt, the 2029 date stands unless a system asks for more time and gets it, and the four other limits stay on the books until a final rule removes them.

2. The states did not wait

Several states set their own enforceable limits years before EPA, and some have moved since.

Federal rule, 2024 (compliance by Apr 2029)4ppt
Vermont, 20264ppt
Michigan, 20208ppt
New York, 202010ppt
New Jersey, 202014ppt
Pennsylvania, 202314ppt
Enforceable limits for PFOA in drinking water, in parts per trillion, with the year each took effect. PFOS limits are 4.0 federal, 4.0 Vermont, 16 Michigan, 10 New York, 13 New Jersey and 18 Pennsylvania. California has no enforceable limit; its notification level for PFOA has been 4.0 since October 2025. Massachusetts and Wisconsin are left out because I could not open their current rule text.89 FR 32532 (26 Apr 2024); Vermont Water Supply Rule, effective 1 Jan 2026; Michigan EGLE, rules effective 3 Aug 2020; 10 NYCRR Subpart 5-1, Table 1; N.J.A.C. 7:10-5.2, effective 1 Jun 2020; 25 Pa. Code 109.202, effective 14 Jan 2023.

New Jersey set its PFOA and PFOS limits in 2020, at 14 and 13 ppt, with monitoring from the first quarter of 2021. Its PFNA limit of 13 ppt dates from 2018. Under the state rule, a system that violates a limit has one year to fix it. Vermont's new rule took effect on January 1, 2026, with 4.0 ppt for PFOA and PFOS and limits for the very PFAS that EPA proposes to drop. California has no enforceable limit, but in October 2025 it lowered its notification levels for PFOA and PFOS to 4.0 ng/L.

A New Jersey limit of 14 ppt is looser than the federal 4.0. The state limit came first, though, and it carries its own enforcement. For a utility over 14 ppt in 2021, the federal date of 2029 was a second, later deadline.

3. Ridgewood's deadline is the end of 2026

Ridgewood Water's PFAS questions page says: "In May 2023, Ridgewood Water voluntarily entered into an Administrative Consent Order (ACO), recognizing the need for comprehensive treatment, setting a goal to have all treatment facilities online by the end of 2026." The plan is to consolidate 31 treatment points into 12 new plants.

The Q3 2026 notice shows how far there is to go. As of September 30, PFOA was over the state limit at 17 points of entry, with running annual averages of 13 to 36 ppt, and PFOS at three. "Our water system was not able to remediate the PFOA and PFOS MCL violations at seventeen (17) points by the one-year deadline."

Farview36ppt
Meer33ppt
Lakeview31ppt
Eder28ppt
Lafayette28ppt
Cedar Hill27ppt
College27ppt
Russell27ppt
Ames25ppt
Weisch25ppt
Main24ppt
E. Saddle River23ppt
Waldo19ppt
Wortendyke18ppt
Midland17ppt
Salem15ppt
Van Houten13ppt
PFOA at the 17 points of entry Ridgewood Water reported over New Jersey's limit of 14 ppt as of 30 Sep 2026, as running annual averages in parts per trillion, values as printed in the notice. Every value is more than three times the federal limit of 4.0 (derived). Eight of the twelve new treatment plants were online at the time.Ridgewood Water, Q3 2026 PFAS public notice, 16 Oct 2026, p. 1.

Every one of those 17 readings is more than three times the federal 4.0 ppt (derived). Ridgewood says that when all twelve plants are running, regulated PFAS will be non-detectable in treated water.

The plants went out one contract at a time. Ridgewood's September 2025 construction update lists them, from the Carr plant, awarded in November 2018 for $2.67 million and running by September 2019, to Cedar Hill, the largest, at 3.6 million gallons a day.

Carr: awarded Nov 2018, online Sep 2019$2,672,612
Twinney: Nov 2021, Aug 2022$532,000
Ravine: Apr 2023, Nov 2025$3,943,000
Prospect: Aug 2023, Oct 2025$9,416,000
Ames: Apr 2024, Apr 2026$9,984,890
East Ridgewood and West End: Aug 2024, Jan 2026$7,773,000
Wortendyke: Oct 2024, Feb 2026$6,315,750
Eastside: Sep 2025, Oct 2026 planned$7,776,500
Mountain: Sep 2025, Oct 2026 planned$3,554,013
Main: Sep 2025, Oct 2026 planned$3,300,000
Cedar Hill: awarded Nov 2025, early 2027 planned$14,554,000
Ridgewood Water's twelve PFAS treatment plants as eleven construction contracts, in dollars, with the award and the date each went or is planned to go online. They add up to about $70 million (derived, with Cedar Hill at its award ceiling). With engineering, administration and inspection, the program was projected at $98 million in September 2025.Ridgewood Water, PFAS Treatment Construction Update, 29 Sep 2025; Village of Ridgewood, Resolution 25-424, 12 Nov 2025 (Cedar Hill, Pact Two, LLC).

The construction awards add up to about $70 million (derived, with Cedar Hill at its award ceiling of $14,554,000). The same update puts the whole program, with engineering and inspection, at $98 million, against $89 million in the 2020 master plan. Most of it is financed through the New Jersey Water Bank, the state revolving fund. Customers pay for it through a separate PFAS surcharge, which went from $24.71 to $37.07 a quarter for a standard meter in 2025, according to the rate consultant's review of that year's budget.

Cedar Hill shows how a state deadline can slip for state reasons. The first low bidder withdrew in October 2025, and under state law a bidder who withdraws cannot be awarded the rebid. The Village Council awarded the contract to Pact Two, LLC on November 12, 2025, for up to $14,554,000. In the minutes of that meeting, the Village explains that the consent order "requires that the work be completed by the end of 2026", that NJDEP required an archaeological dig at the site, and that "there is a chance that this may run into the first quarter of 2027."

Ridgewood: first plant contract to last plant online · Nov 2018 to early 2027
New Jersey limits in effect, to the consent order date · Jun 2020 to end of 2026
Federal rule to its compliance date · Apr 2024 to Apr 2029
Proposed federal exemption, on request · Apr 2029 to Apr 2031, not final
Carlisle, PA: pilot to the federal date · Dec 2023 to Apr 2029
2019202120232025202720292031
The deadlines on Ridgewood's plants and on Carlisle's, side by side. Ridgewood's binding date is the state consent order at the end of 2026; Carlisle meets Pennsylvania's limits and is designing for the federal date. The 2031 bar is a proposed exemption that a system must request, and EPA's version covers states without primacy for the rule.N.J.A.C. 7:10-5.2; Ridgewood Water, PFAS Q&A and PFAS Treatment Construction Update, 29 Sep 2025; Village of Ridgewood minutes, 12 Nov 2025; 89 FR 32532; 91 FR 29425; Borough of Carlisle PFAS page and Council minutes, 13 Aug 2026.

4. The same rule, the opposite case

The Borough of Carlisle, Pennsylvania, sits on the other side of the patchwork. Pennsylvania's limits are 14 ppt for PFOA and 18 for PFOS. Carlisle's highest results were 7.1 and 15.8, under the state limits and over the federal ones. Its PFAS page says: "Although the Borough's water meets Pennsylvania's existing drinking water requirements, the new federal standards require additional treatment". On August 13, 2026, the Borough Council voted 7-0 to approve the treatment evaluation and a final design contract of up to $738,000.

For Carlisle, the 2031 proposal could change the schedule. Ridgewood's schedule is set by the state, and both utilities read the same federal news.

If you sell to utilities

  1. Find out which deadline a utility is on before you read anything into federal news. A state limit, a consent order or a quarterly public notice will usually tell you.
  2. Read the quarterly PFAS notices where a state requires them. Ridgewood's lists every point of entry, its running average and the plants still under construction.
  3. Look at how the work is bought. Ridgewood bid each plant separately, and in May 2025 it put the carbon treatment systems for three plants out in their own bids, apart from construction. That is a different sale from a single large design-build contract.
  4. Watch what comes after the plants. On November 4, 2026 the Council's agenda listed an engineering contract for "Surface Water Interconnections PFAS Alternatives and Distribution System Optimization".

What I don't know yet

  • The text of the 2023 consent order and whether NJDEP has formally extended it for Cedar Hill.
  • Whether New Jersey will adopt the federal 4.0 ppt, and when. I have found no proposal.
  • Whether EPA will finalize the 2031 exemption, and in what form.
  • Whether Ridgewood has received money from the national PFAS settlements. It is a plaintiff in the federal litigation, and I found no receipt in its council records.

The next marker for Ridgewood is Cedar Hill coming online in early 2027. The next marker for everyone else is EPA's final rule on the extension.

At AquaIntel we read state rules, consent orders, quarterly notices and council awards together and keep each with its date, so a vendor can see which deadline a utility is working to and what it has already bought.

Sources

I write about US water utility buying signals every two weeks. .